In short
- On a flat site: 35 to 50 m² of hardwood or composite with stairs and some extras.
- On a hill site: a smaller raised deck with engineering and a consent.
- Decide what the money is for before you decide the size.
Fifty thousand dollars is a serious deck budget. On a flat section it buys a large hardwood or composite deck with features. On a steep section a good share of it goes into the structure before a single board is laid.
On a flat site
At $900 to $1,400 per square metre for hardwood, $50,000 covers 36 to 55 square metres of deck alone. Most people spend it differently: a deck of about 35 square metres, then the things that make it an outdoor room.
| Item | Typical share of a $50,000 job |
|---|---|
| 35 m² hardwood deck | $31,500 to $49,000 |
| Wide steps to the lawn | From a few hundred dollars to $2,500 |
| Built-in bench seating | Priced per job |
| Pergola over part of the deck | $4,000 to $16,000 |
| Lighting and power | Priced by your electrician |
| Oil or stain | Priced per job |
Step and pergola figures are broad guides. The parts will not all fit at the top of every range, which is the point: at this budget you choose between a bigger deck and a better-equipped one.
On a hill site
A raised deck in Cashmere, Mount Pleasant or Sumner changes the sums. Expect to pay for an engineer's design, a building consent, tall piles and bracing, scaffolding and a balustrade at $250 to $450 per lineal metre. With glass on a 14 metre run, the balustrade alone can pass $6,000. A $50,000 budget on a steep site commonly builds 20 to 30 square metres.
How to spend it well
- Start with how you will use it. Dining, lounging, a spa, a play area for children. Size follows from that.
- Put shelter ahead of area. A covered 25 square metres gets used more than an open 45.
- Choose boards for your site. Shade, salt and full sun each point to different materials. See the materials guide.
- Get the consent question answered early. It affects both cost and timing.
The contract
For any residential building work of $30,000 or more, the builder must give you a written contract, a disclosure statement and the standard checklist before you sign. Agree a payment schedule tied to stages of the job, not dates.
Common questions
Is $50,000 enough for a deck in Christchurch?
On a flat site it is enough for a large hardwood or composite deck with steps and a pergola. On a steep site it builds a smaller raised deck once engineering, consent and balustrades are paid for.
How long does a deck of this size take?
Two to four weeks on site, plus time beforehand for design and, if needed, a building consent.
Do I need a contract?
Yes. Building work of $30,000 or more requires a written contract by law.